par Tectonic Metals Inc. (CVE:TECT)
Tectonic Metals Drills 9.94 g/t Au over 36.58 meters including 15.73 g/t Au over 22.86 metres with 104.23 g/t Au over 3.05 meters at Chicken Mountain, Flat Gold Project
364 Gram-Metre Near-Surface Drill Intercept Anchors New High-Grade Corridor
Assay Results Pending from 34 Additional Drill Holes Across Multiple Targets
VANCOUVER, BC / ACCESS Newswire / January 22, 2026 / Tectonic Metals Inc. ("Tectonic" or the "Company") (TSXV:TECT)(OTCQB:TETOF) today announced additional drill assay results from the Company's flagship 99,800-acre Flat Gold Project in Southwest Alaska. Results are highlighted by a 364 gram-metre intercept at Chicken Mountain returning 9.94 g/t Au over 36.58 m, including 15.73 g/t Au over 22.86 m, with a bonanza-grade interval of 104.23 g/t Au over 3.05 m (hole CMR25-084), see Figure 1. The hole ended in mineralization at 54.86 m, indicating strong down-dip and along-strike expansion potential.
Assay results from 42 drill holes are reported herein - 4 diamond core holes and 38 reverse circulation ("RC") holes - representing approximately 3,950 metres ("m") of drilling from the Company's 18,373â¯m 2025 program. Drilling targeted step-out expansion and early-stage resource delineation in the southern portion of the Chicken Mountain intrusion.
CEO Commentary
"There aren't many times in your career when you can announce a 364 gram-meter intercept and follow that with '...and by the way, the project boasts a 100% drill success across 176 drill holes,' " stated Tony Reda, President and CEO. "That combination is rare in exploration. Every single hole hit gold, which we believe is evidence of a very robust mineralizing gold system. Furthermore, the bonanza-grade intercept in drill hole CMR25-084 demonstrates that the Chicken Mountain system can generate high grades within mappable structural corridors."
"And we're only scratching the surface.... literally. The fact that 65% of our holes ended in mineralization, including a 425-metre-long drill hole, means we're drill-limited, not geology-limited. When you combine that depth extent with our demonstrated 3-kilometer strike length at Chicken Mountain, you start to see the scale potential here."
"We're systematically advancing toward a maiden mineral resource estimate while maintaining substantial blue-sky exploration upside across our 99,800-acre land package. With assays pending from 34 additional drill holes and aggressive drilling planned for 2026, our shareholders can expect continuous news flow and another exciting year ahead."
Chicken Mountain Video and Figures
Please watch a video highlighting the 2025 resource delineation drilling at Chicken Mountain: Click Here to View Video
Drill plan maps andâ¯images can be found below and by clicking here to view: Click Here to View Plan Maps and Images
Key Geological Achievements and Characteristics
364 Gram-Metre Bonanza Intercept Anchors a New Interpreted Higher-Grade Corridor, see Figure 3 and 4.
|
2. 100% Drill Success Rate |
|
3. Significant Resource Expansion Potential |
|
|
|
4. Multiple Interpreted Higher-Grade Corridors Emerging, see Figure 2 |
|
|
|
|
2. Central Chicken Mountain Corridor 1 |
|
|
|
3. Central Chicken Mountain Corridor 2 |
|
|
|
4. Northern Chicken Mountain Corridor |
|
|
|
5. Adit Higher-Grade Corridor |
|
|
|
6. Alpha Bowl Higher-Grade Corridor |
|
Key Drill Highlights Reported Today
CMR25-084 (Bonanza grade intercept)
104.23 g/t Au over 3.05 m, within
15.73 g/t Au over 22.86 m, all within
9.94 g/t Au over 36.58 m
RC drill ending in mineralization; total hole length 54.86 m
CMD25-027
4.79 g/t Au over 5.00 m, within
1.77 g/t Au over 16.00 m, all within
0.74 g/t Au over 95.00 m1.07 g/t Au over 13.00 m, and
0.61 g/t Au over 83.00 m, all within
0.52 g/t Au over 118.00 m
Diamond drill hole drill ending in mineralization; total hole length 322.17 m
CMR25-080
1.09 g/t Au over 25.91 m, within
0.62 g/t Au over 89.92 m
RC drill hole ending in mineralization; total hole length 91.44 m
CMR25-091
1.02 g/t Au over 21.34 m, within
0.55 g/t Au over 72.54 m
RC drill hole ending in mineralization; total hole length 80.16 m
CMR25-100
1.27 g/t Au over 15.24 m, and
1.09 g/t Au over 9.14, all within
0.49 g/t Au over 115.82 m
RC drill hole ending in mineralization; total hole length 121.92 m
CMR25-073
1.08 g/t Au over 13.72 m, and
0.96 g/t Au over 10.67 m, all within
0.46 g/t Au over 91.44 m
RC drill hole ending in mineralization; total hole length 91.44 m
CMD25-029
0.83 g/t Au over 49.00 m, within
0.45 g/t Au over 179.00 m
Diamond drill hole drill ending in mineralization; total hole 321.56 m
Results Summary
A summary of the results released today for the 38 RC holes are presented by drill section in Table 1, and a summary of the four diamond drill core results are presented in Table 2. Data pertaining to locations of drill holes included in the announcement are presented in Table 3. Full assay results for the 38 RC and four core results can be found at this link: Click Here for Full Assay Results.
Chicken Mountain Video and Figures: Please watch a video highlighting the scale and potential of the Chicken Mountain: Click Here to View Video
Drill Plan Maps andâ¯Images: Click Here to View. Select images below. â¯â¯
Assay Results From 34 Additional Holes Pending
Remaining 2025 resource delineation drilling at Chicken Mountain
Exploration drilling at Alpha Bowl testing the additional 500m strike potential
First-pass exploration drilling at Black Creek and Jam Intrusion targets
Follow up drilling at Golden Apex
Tectonic will provide further updates as results are received, interpreted, and validated
To learn more about the 2025â¯Drill Programs, clickâ¯here:â¯Tectonic Metals Delivers Record 18,372 Metres Across 125 Drill Holes at Flat Gold Project, Alaska
Figure 1:â¯Plan View and Long Section looking Northeast, drill results and pending drill hole assays can be viewed at: CLICK HERE TO VIEW FIGURE 1

Figure 2:â¯Plan View of Chicken Mountain, highlighting the interpreted higher grade corridors can be viewed at: CLICK HERE TO VIEW FIGURE 2

Figure 3:â¯Plan View of Chicken Mountain South Area, highlighting the drilling lines, drill results and pending drill hole assays can be viewed at: CLICK HERE TO VIEW FIGURE 3

Figure 4:â¯Cross Section Looking North of Drilling Line 1, highlighting drill results and higher grade corridors can be viewed at: CLICK HERE TO VIEW FIGURE 4

Tableâ¯1. Significant Highlights Chicken Mountain RC Drill Results Line 1*â¯
Hole ID | From (m) | To (m) | Length (m) | Au (g/t) | |
CMR25-069 | 25.91 | 44.20 | 18.29 | 0.49 | |
RC | including | 28.96 | 30.48 | 1.52 | 1.17 |
TD=44.20 m | with | 36.58 | 42.67 | 6.10 | 0.77 |
End in Min: Yes | |||||
CMR25-070 | 38.11 | 83.84 | 45.73 | 0.55 | |
RC | including | 38.11 | 77.74 | 39.63 | 0.62 |
TD=105.18 m | with | 56.40 | 77.74 | 21.34 | 0.78 |
End in Min: Yes | |||||
89.94 | 105.18 | 15.24 | 0.33 | ||
CMR25-073 | 0.00 | 91.44 | 91.44 | 0.46 | |
RC | including | 12.19 | 28.96 | 16.76 | 0.75 |
TD=91.44 m | with | 15.24 | 25.91 | 10.67 | 0.96 |
End in Min: Yes | and including | 74.68 | 88.39 | 13.72 | 1.08 |
TD=91.44 m | |||||
End in Min: Yes | 86.87 | 88.39 | 1.52 | 6.22 | |
CMR25-076 | 64.01 | 92.96 | 28.96 | 0.52 | |
RC | including | 71.63 | 89.92 | 18.29 | 0.71 |
TD=103.63 m | with | 79.25 | 89.92 | 10.67 | 1.00 |
End in Min: No | and with | 83.82 | 85.34 | 1.52 | 4.57 |
CMR25-077 | 15.24 | 51.82 | 36.58 | 0.37 | |
RC | including | 18.29 | 32.00 | 13.72 | 0.52 |
TD=53.34 m | |||||
End in Min: Yes | |||||
CMR25-080 | 1.52 | 91.44 | 89.92 |