COMMUNIQUÉ DE PRESSE

par Ameriwest Critical Metals (CVE:AWCM)

Ameriwest Critical Metals Highlights the Potential of the Bornite Copper Project with the Release of Historical Drill Intercepts

Analysis of Historical Data Reveals the Potential of the High-Grade Outer Shell of the Bornite Breccia Pipe (the "Pipe"), with Multiple Intercepts Exceeding 1.5% Copper Equivalent ("CuEq"), Including 110 ft of 10.831% CuEq and 140 ft of 9.423% CuEq, and the Potential of the Lower-Grade Interior Pipe with Intercepts Exceeding 0.5% CuEq, including 980 ft of 1.453% CuEq and 672 ft of 1.106% CuEq.

VANCOUVER, BC / ACCESS Newswire / June 3, 2026 / Ameriwest Critical Metals Inc. (CSE:AWCM)(OTC:AWLIF)(FSE:5HV) ("Ameriwest" or the "Company") is pleased to announce that it has digitized and completed a review of historical drill hole information for the Company's 100% owned Bornite copper-gold-silver project in Oregon ("Bornite" or the "Project"). Mineralization occurs principally as bornite and chalcopyrite within a roughly cylindrical, vertically oriented, cigar-shaped breccia pipe.

Ameriwest's CEO, Mr. David Watkinson, stated, "The historical drill database at Bornite provides Ameriwest with a substantial technical foundation for modern verification work. The broad and higher-grade historical intervals reported today strongly support our view that Bornite warrants systematic advancement through re-logging, selective re-assaying, modelling and planned drilling. Our objective is to convert this historical information into a modern technical framework that can guide exploration and potential future mineral resource evaluation."

Significant mineralized intervals include:

  • Hole CC02: 165 ft of 8.107% CuEq from a depth of 255 ft to 420 ft, including 140 ft of 9.423% CuEq from 280 ft to 420 ft

  • Hole CC03: 980 ft of 1.453% CuEq from a depth of 140 ft to 1,120 ft

  • Hole CC06: 260 ft of 5.222% CuEq from a depth of 360 ft to 620 ft, including 210 ft of 6.293% CuEq from 360 ft to 570 ft

  • Hole CC09: 320 ft of 1.195% CuEq from a depth of 400 ft to 720 ft

  • Hole CC11: 150 ft of 8.246% CuEq from a depth of 440 ft to 590 ft, including 110 ft of 10.831% CuEq from a depth of 470 ft to 580 ft

  • Hole CC16: 370 ft of 0.786% CuEq from a depth of 270 ft to 640 ft

  • Hole CC17: 672 ft of 1.106% CuEq from a depth of 8 ft to 680 ft

  • Hole CC18: 137.5 ft of 3.486% CuEq from a depth of 12.5 ft to 150 ft

  • Hole CC24: 180 ft of 4.500% CuEq from a depth of 230 ft to 410 ft, including 160 ft of 5.007% CuEq from a depth of 250 ft to 410 ft

  • Hole CC25: 120 ft of 3.877% CuEq from a depth of 360 ft to 480 ft

  • Hole CC26: 470 ft of 1.563% CuEq from a depth of 270 ft to 740 ft, including 120 ft of 3.344% CuEq from a depth of 280 ft to 400 ft

  • Hole CC29: 539 ft of 2.050% CuEq from a depth of 111 ft to 650 ft

  • Hole CC30: 270 ft of 3.435% CuEq from a depth of 250 ft to 520 ft, including 120 ft of 6.159% CuEq from a depth of 260 ft to 380 ft

  • Hole CC33: 140.5 ft of 3.889% CuEq from a depth of 590 ft to 730.5 ft

  • Hole CC34: 341 ft of 1.604% CuEq from a depth of 360 ft to 701 ft

  • Hole CC37: 330 ft of 1.939% CuEq from a depth of 400 ft to 730 ft, including 110 ft of 3.670% CuEq from 420 ft to 530 ft

  • Hole CC39: 235 ft of 3.290% CuEq from 131 ft to 366 ft

  • Hole CC40: 143 ft of 3.169% CuEq from 130 ft to 273 ft, including 129 ft of 3.415% CuEq from 144 ft to 273 ft

(Note: In this news release, all intervals are downhole lengths; true widths are currently unknown. CuEq grades were calculated using a copper price of US$6.40 per pound, a gold price of US$4,500 per ounce, and a silver price of US$75 per ounce. CuEq grades are calculated according to the formula: CuEq grade = (Cu grade) + (45.67641 x Au grade) + (0.80357 x Ag grade). Copper recovery of 95%, gold recovery of 90%, and silver recovery of 95% were used, based on metallurgical test work completed by Plexus Resources and outlined in the Bornite Project Prefeasibility Analysis dated December 1992 which included metallurgical work by Dawson Metallurgical Laboratories. This data is historical in nature, predating the implementation of National Instrument 43-101 ("NI 43-101") and CIM standards. Results have not been independently verified by a Qualified Person. The Company is not treating these historical results as current drill results or mineral resources. The Company is currently completing re-logging and re-assaying historical drill core and plans to conduct confirmation and infill drilling to allow these data to be used in a current resource calculation in the future.)

Historical Drilling and Database Review

The historical drilling database reviewed by Ameriwest includes information for 48 drill holes completed by Amoco, Cypress Minerals, and Plexus Resources between 1976 and 1990. This current database consists of 38,914.5 feet of historical drilling; however, historical records reviewed by the Company indicate that approximately 41,702 feet of drilling were completed at Bornite. The difference between the current database total and the historical reported total footage may relate to the lack of currently available information for holes CC07 and CC21 and/or to other historical holes drilled by those companies in the regional area that were not part of the Bornite target.

Table 1 below shows significant intercepts greater than or equal to 100 ft in length with intervals selected using a 0.5% CuEq cut-off grade. Within these intervals, additional "including" intervals were interpreted, having a cut-off grade of 1.5% CuEq.

According to the 1992 Pre-feasibility Study completed by Plexus, drill cores were logged for structure, lithology, estimated copper grade, core recovery, and RQD. Samples were generally collected from core at 10-foot intervals, except where a sharp lithological break occurred within a 10-foot interval. The majority of assays completed for Plexus were performed by Bondar-Clegg in Vancouver, British Columbia. Copper was analyzed by multi-acid digestion and atomic absorption spectroscopy. Gold and silver were determined using standard one-assay-ton fire assay methods.

Table 1

Bornite Project

Significant Intercepts Greater Than or Equal to 0.5% CuEq

Hole

From

To

Length

%Cu

Ag opt

Au opt

%CuEq

Number

(feet)

(feet)

(feet)

CC02

255.0

420.0

165.0

4.101

1.391

0.063

8.107

including

280.0

420.0

140.0

4.735

1.597

0.075

9.423

CCO3

140.0

1120.0

980.0

0.874

0.355

0.006

1.453

CC06

360.0

620.0

260.0

3.295

0.832

0.028

5.222

including

360.0

570.0

210.0

3.928

1.013

0.034

6.293

CC09

400.0

720.0

320.0

0.894

0.236

0.002

1.195

including

530.0

630.0

100.0

1.775

0.308

0.006

2.292

CC11

440.0

590.0

150.0

4.808

1.349

0.052

8.246

including

470.0

580.0

110.0

6.256

1.786

0.069

10.831

CC11

680.0

790.0

110.0

1.745

0.276

0.008

2.328

CC16

270.0

640.0

370.0

0.576

0.150

0.002

0.786

CC17

8.0

680.0

672.0

0.906

0.183

0.001

1.106

CC18

12.5

150.0

137.5

3.112

0.147

0.006

3.486

CC24

230.0

410.0

180.0

2.629

0.721

0.028

4.500

including

250.0

410.0

160.0

2.912

0.803

0.032

5.007

CC25

360.0

480.0

120.0

2.343

0.739

0.021

3.877

CC26

270.0

740.0

470.0

1.177

0.216

0.005

1.563

including

280.0

400.0

120.0

2.295

0.472

0.015

3.344

CC27

439.5

640.0

200.5

1.600

0.497

0.006

2.276

including

640.0

500.0

150.0

1.855

0.613

0.006

2.621

CC28

150.0

370.0

220.0

2.163

0.335

0.008

2.796

including

150.0

350.0

200.0

2.293

0.353

0.009

2.977

CC29

111.0

650.0

539.0

1.432

0.386

0.007

2.050

including

280.0

380.0

100.0

1.540

0.607

0.009

2.421

including

540.0

650.0

110.0

2.077

0.843

0.011

3.241

CC30

250.0

520.0

270.0

2.379

0.340

0.017

3.435

including

260.0

380.0

120.0

4.235

0.388

0.035

6.159

CC31

490.0

621.0

Voir toutes les actualités de Ameriwest Critical Metals